Difference between revisions of "Technic City Trains"

From Pandorabox
Jump to navigation Jump to search
m ('new' won't age well)
Line 1: Line 1:
 
[[File:TechnicCityTrains.webp|thumb|Proposed services map of TCT]]
 
[[File:TechnicCityTrains.webp|thumb|Proposed services map of TCT]]
'''Technic City Trains''' (TCT) is a new railway operator in the greater [[Technic City]] area. Its authority is delegated by [[User:BuckarooBanzai|BuckarooBanzai]] to [[User:Blockhead|Blockhead]] for the purpose of building railways and stations and operating trains in the area. It has current plans to operate two lines and to co-operate with [[PRC]] to ensure any regional connections.
+
'''Technic City Trains''' (TCT) is a railway operator in the greater [[Technic City]] area. Its authority is delegated by [[User:BuckarooBanzai|BuckarooBanzai]] to [[User:Blockhead|Blockhead]] for the purpose of building railways and stations and operating trains in the area. It has current plans to operate two lines and to co-operate with [[PRC]] to ensure any regional connections.
  
 
== Services ==
 
== Services ==

Revision as of 14:51, 23 November 2021

Proposed services map of TCT

Technic City Trains (TCT) is a railway operator in the greater Technic City area. Its authority is delegated by BuckarooBanzai to Blockhead for the purpose of building railways and stations and operating trains in the area. It has current plans to operate two lines and to co-operate with PRC to ensure any regional connections.

Services

TCT will operate two lines: The U1 metro line and S1 local train.

All station names given are still provisional. Please leave your feedback on the Talk page.

The U1 line will operate two kinds of services: Clockwise and anticlockwise. The stations (in clockwise order) are so far proposed with the names: Tardis, Workshop, Beach and Excavations. In Stage 2, clockwise services are proposed to stop at a new station at Technic City Harbour, which is between Excavations and Beach. Anticlockwise services will go straight from Excavations to Beach.

The S1 line will operate out of a new third terminal track at Tardis station and have a stop at Brickhouse, and later in Stage 2 at Snowy End.

History

TCT was founded on 23 November 2021 after Blockhead volunteered to operate trains in the area after noticing there was a decent amount of right of way already in place. Authority was quickly given to allow him to work on the railway.